April72014
Taking a look at the automated floor in Studio B today.

Taking a look at the automated floor in Studio B today.

April32014

Fixing the automated seating bank in Studio B on the Liberty of the Seas.

March242014

Stage deck for Shawn T to work out on.

February242014
The inevitable natural black stool.  Touching up all of ours today.

The inevitable natural black stool. Touching up all of ours today.

February202014

Stitching a boucle drop torn about 1.5meters long. Showtime tonight.

February152014

Hanging a point for a silk.

10AM

Learning the operation of another Waagner-Biro control board for the ice show

10AM
January272014
Changing cables on the Foy automation.

Changing cables on the Foy automation.

January232014
Training on the FOY Flying Automation

Training on the FOY Flying Automation

← Older entries Page 1 of 14